English Enterprise Carpentry, Carpenter, Omaha, NE
top of page
Search

Basement Floor Renovation

  • Writer: Anthony English
    Anthony English
  • Dec 28, 2022
  • 1 min read

Started by removing almost 700 sq. ft. of carpet, pad and tack strips. Then leveled entire floor with LevelQuick RS (48 / 50lb bags total). Next came Happy Feet Showtime LVT flooring with Smartcore underlayment. Finished it all with new pvc waterproof base molding.
















 
 
 

Recent Posts

See All
Water Damage Restoration

Restored water damage to several areas.  First all new drywall in the garage, hallway, both bathrooms and bedroom and bedroom closet...

 
 
 
Porch Renovation

Renovated this porch with all new pressure treated flooring and framed metal lattice.  Far side of lattice hinged for access.

 
 
 
Bar Wrap

Collaborated with the client to do one of the coolest, and most intricate jobs I've ever been a part of.  Wrapping this bar in solid...

 
 
 

Comments


(402) 370-9999

©2019 by English Enterprise Carpentry. Proudly created with Wix.com

bottom of page